History of our activity
Solar Trading Company started its activity in the field of solar power plant development in 2014 and started to develop a 10 MW solar power plant project in Iran, Kerman province, to choose the location of the power plant according to maximizing the project’s income and reducing all costs, various parameters were considered as the criterion for this work, and after selecting and issuing a license for the guaranteed purchase of electricity 20 years with the Ministry of Energy (SATBA), it intends to build this project and other solar projects in Iran.
Creating the necessary infrastructure for benefiting, flourishing, and creating value with the aim of increasing the quality of life.
Providing energy to empower people, create a sustainable
future for our planet
Solar Tejarat Isatis Kavir Company was established in 2013 and is under the name of a private joint stock company and the members of the company include 3 people, Mr. Omid Ahmadi is the CEO and member of the board of directors, Mr. Akbar Ahmadi is the chairman of the board of directors and a member of the board of directors, and Ms. Mina Ahmadi is a member of the board of directors. The executive team of this company includes the managing director, administrative and organizational staff, consultants and technical managers, the financial department consists of the accounting team and the independent auditor
Omid Ahmadi, a graduate of Yazd Azad University and the CEO of Isatis Kavir Solar Trading Company, has been at the helm of this company since 2014, and Isatis Kavir Company has been able to become a reputable brand in the field of renewable energy during this period.
Omid Ahmadi - CEO
Isatis Kavir Company, which is also a member of the Satka Association, has the ability to design and implement a variety of electricity supply systems based on renewable resources completely independently of the off-grid grid, connected to the on-grid grid and connected to the grid with a backup system. The design of all types of solar systems in this company is based on the international design standards of NEC and IEC and domestic national standards, and all the main equipment is supplied from the products of Korean and Chinese companies and other leading countries in the field of solar energy
Isatis Kavir Company, due to its technical, engineering and executive support, has been operating in the field of renewable energy since 2014 and the scope of this company’s experience covers national power plant projects to small domestic projects and
Kerman, Yazd, and other desert provinces also have suitable cities for the construction of solar power plants. Isatis Kavir Company has successfully designed and implemented several solar power plants in different parts of the above provinces.
Design of this solar power plant in Kerman, Bam city, in 2018, a guaranteed electricity purchase contract was obtained.
Bam Power Plant is one of the first 10 MW power plants that uses bifacial bifacial panels in its design. Isatis Kavir Company has designed this power plant based on Bifacial two-way solar panels, which according to the technology of manufacturing such panels, their use causes a significant increase in the output efficiency of Bam solar power plant. Also, the structures of this power plant have been designed and installed by Isatis Kavir as the first Bifacial structures in Iran. It has fully designed, procured equipment and implemented the solar power plant.
Also, the first example of a localized monitoring and control system by Isatis Kavir Company has been designed in this project.
At present, this power plant is ready to supply equipment and start the construction period
In 2014, Isatis Kavir Company decided to inaugurate and build a 10 MW solar power plant project in Bam city, and after studying and feasibility studies and choosing the location of the suitable site for the project, due to having 300 days of sunshine and legal procedures and obtaining the necessary permits, after 4 years, it succeeded in obtaining a 20-year guaranteed electricity purchase contract and the land of this project with an area of 200,000 square meters, which is one of the privileges of The project can be mentioned that the project site is naturally flat and without shade and the location of the project site is close to the connection point, which reduces an important part of the construction cost
Investment opportunities
Project Advantages: Flat location of the project site, no shades, proximity of the project to the connection point
Project Advantages: The project site is flat and without shades,