‎History of our‎ ‎activity‎
Solar ‎‎Trading Company‎‎ started its activity in the field of solar power plant ‎‎development in‎‎ ‎‎2014‎‎ and started to develop a‎‎ 10 MW‎‎ solar power plant project in Iran, Kerman province, to choose the location of the power plant according to maximizing the project’s income and reducing all costs, various parameters were considered as the criterion for this work, and after selecting and issuing a license for the guaranteed purchase of electricity ‎‎20‎‎ years with the Ministry of Energy (SATBA), it intends to build this project and other solar projects in Iran.‎

‎Our Mission‎

‎Creating the necessary infrastructure for benefiting, flourishing, and creating value with the aim of increasing the quality of life.‎

 
‎Our Vision‎

‎Providing energy to empower people, create a sustainable‎
‎future for our planet‎

‎Forum‎

‎Solar Tejarat Isatis Kavir Company was established in ‎‎2013‎‎ and is under the name of a private joint stock company and the members of the company include ‎‎3‎‎ people, Mr‎‎. Omid Ahmadi‎‎ is the CEO and member of the board of directors, ‎‎Mr. Akbar Ahmadi‎‎ is the chairman of the board of directors and a member of the board of directors, and ‎‎Ms. Mina Ahmadi‎‎ is a member of the board of directors. The executive team of this company includes the managing director, administrative and organizational staff, consultants and technical managers, the financial department consists of the accounting team and the independent auditor‎

 
‎Managing Director‎

‎Omid Ahmadi‎‎, a graduate of Yazd Azad University and the CEO of Isatis Kavir Solar Trading Company, has been at the helm of this company since ‎‎2014‎‎, and Isatis Kavir Company has been able to become a reputable brand in the field of renewable energy during this period.‎

photo_2024-11-29_15-02-36

Omid Ahmadi - CEO

‎I, ‎‎Omid Ahmadi‎‎, as the CEO of Isatis Kavir Solar Tejarat Company, started his activity in this company in ‎‎2014‎‎ with the aim of developing and advancing solar power plant projects, and the result and result of my activity was obtaining a license for a 20-year guaranteed electricity purchase contract in 2018 and obtaining 200,000 square meters of project land in Bam city and obtaining 6,000 square meters of land in Yazd province, Fahraj village, which is located in the distance between It is 20 km from the city of Yazd and adjacent to the 10 MW Fahraj solar power plant‎
‎The location of the Bam project:‎
‎Yazd-Fahraj Project Location:‎
‎Isatis Kavir Services‎

‎Isatis Kavir Company, which is also a member of the Satka Association, has the ability to design and implement a variety of electricity supply systems based on renewable resources completely independently of the off-grid grid, connected to the on-grid grid and connected to the grid with a backup system. The design of all types of solar systems in this company is based on the international design standards of NEC and IEC and domestic national standards, and all the main equipment is supplied from the products of Korean and Chinese companies and other leading countries in the field of solar energy‎

‎Isatis Kavir Company, due to its technical, engineering and executive support, has been operating in the field of renewable energy since 2014 and the scope of this company’s experience covers national power plant projects to small domestic projects and‎

‎Kerman, Yazd, and other desert provinces also have suitable cities for the construction of solar power plants. Isatis Kavir Company has successfully designed and implemented several solar power plants in different parts of the above provinces.‎

‎Solar Power Plant Project in Bam 

‎Design of this solar power plant in Kerman, Bam city, in 2018, a guaranteed electricity purchase contract was obtained. ‎
‎Bam Power Plant is one of the first 10 MW power plants that uses bifacial bifacial panels in its design. Isatis Kavir Company has designed this power plant based on Bifacial two-way solar panels, which according to the technology of manufacturing such panels, their use causes a significant increase in the output efficiency of Bam solar power plant. Also, the structures of this power plant have been designed and installed by Isatis Kavir as the first Bifacial structures in Iran. It has fully designed, procured equipment and implemented the solar power plant. ‎
‎Also, the first example of a localized monitoring and control system by Isatis Kavir Company has been designed in this project. ‎
‎At present, this power plant is ready to supply equipment and start the construction period‎

‎Description and history of the 10 MW Bam solar power plant project‎

‎In 2014, Isatis Kavir Company decided to inaugurate and build a 10 MW solar power plant project in Bam city, and after studying and feasibility studies and choosing the location of the suitable site for the project, due to having 300 days of sunshine and legal procedures and obtaining the necessary permits, after 4 years, it succeeded in obtaining a 20-year guaranteed electricity purchase contract and the land of this project with an area of 200,000 square meters, which is one of the privileges of The project can be mentioned that the project site is naturally flat and without shade and the location of the project site is close to the connection point, which reduces an important part of the construction cost‎

Investment opportunities

‎1- 10 MW Bam Solar Power Plant Project‎

‎Project Advantages:‎‎ Flat location of the project site, no shades, proximity of the project to the connection point‎

‎2- 0.5 MW Yazd Project‎
‎Project ‎‎Advantages:‎‎ The project site is flat and without shades,
transmission line passage and connection to the network in the vicinity of the project, project land ownership‎